New Page 2
 
 
 
  Flooring Vitrified tiles
Bathroom Flooring and wall tiles Designer series
  Ventilator
UPVC/ WOOD FRAMED GLASS/ ALUMINIUM FRAMES
(or as per the advise of the architect)
Each Flat shall have 1 bath tub, 1 shower glass cubicle
Utility Area 8" x 12" wall tiles upto 4" feet height (white)
  Door Flush Doors
Hinges/Lock from dorma
  Windows UPVC/ WOOD FRAMED GLASS/ ALUMINIUM FRAMES
(or as per the advise of the architect)
  Electrical Points provision shall be made for the following :
   
  A/c (Split) units in all bedrooms & living room
  Geyser & Exhaust Fan in all toilets & kitchen
  TV/Telephone points in all bedrooms, living & dining
  Intercom
  Provision for Video Phone
  Provision for Computer point in all bedrooms
  Fans/Light points in living, dining, bedrooms, kitchen, foyer balcony, pooja room
    & toilet
  Separate 3 phase distribution board for lighting and power with earth leakage
    circuit breaker for protection against shocks
  3 Phase power for each flat
  DG backup power to an extent of 1KW per flat for lighting & small power
    automatic change over DG during power failures & flexibility of using any light/fan/TV socket/Fridge socket on DG to a limit of 1KW
  Necessary/adequate points for common areas and amenities (Fitness Centre,
    Indoor Games, Pumps, Motors, Light in Drive ways, Boundary, Common Areas etc)
  Provision for telephone points in bathrooms
  Provision for points for electrical gaddgets like aquaguard, microwave, electric
    chimney, mixie, toaster, coffee maker, grinder, fridge, washing machine, dishwasher shall be given.
  The Generator shall be installed at an appropriate location preferably in the
    South East corner of the plot.
     
  Materials
  FRLS Wire - Finolex / Anchor
  Switches - Anchor Wood / Anchor Roma
  PVC Conduits - A-Von Plast
  Distribution Board - MDS Legrand
  ELCB/MCB - MDS
  Automatic change over current limiter (ACCL)
     
  Plumbing
  European Water Closet - Wall mounted with flush valve
  Wash Basin - Counter type
  Tap for wash basin - Single lever basin mixer (Jaguar)
  EWC - Health Faucet
  Shower Area - Single lever divertor
  Paper holder for EWC - Stainless Steel Concealed
  Soap Dish - Stainless Steel Concealed
  Stainless Steel Sink for floor Pantry - Single bowl with drain board
  Liquid soap dispencer for public area toilets
  Urinal flushing system for public area toilets - Flush valve
  Urinal flushing system for staff toilets - Flush Valve
  Wash basin in public area toilets - Only cold water
  Sanitary ware colour - 50% Colour
  Sanitary ware make - Hindustan / Parry
  CP fittings range - Quarter turn
  CP fittings make - Jaguar
  CSC for master control in toilets
  CP Grating - Cockroach trap
  CP Towel rack / CP Towel ring & rod
  Two way Coat / Robe hooks
  Water supply pipes - Galvanised iron 'TATA' "B" class
  CPVC Flowguard
  Isolation Valves - Ball valve (lever operated)
  Lawn Hydrant points for Gardening
  Water point for car wash in the basement
  Water Treatment Plant
  Reverse Osmosis (RO) Plant - Only for Drinking & Cooking
  Source of Water - Municipal / Bore well
  Water storage of : Under ground water - 2 days
  Over head tank - 0.5 days
  Bore well water - UG sump storage.
  Landscaping area piping - Hydropneumatic system
  Water supply Ringmain - Ground floor (Stilt-Ceiling level)
  Drainage pipes - PVC / Under ground drainage line - PVC
  Rungs/Steps for UG sump - Solid Plastic
  Cover for inspection chamber & manholes - Pre cast RCC cover
  Final Sewage disposal - STP
  Rain water disposal (Excess) - Surface drain
  Rain Water Harvesting System
  Waste Water Treatment Plant - Provisional
  Recycling of Treated waste water - Landscaping is subjective
     
  Painting
  Interior walls will be finished with POP patti and 2 coats of Berger or Asian
    Emulsion Paint
  Exterior - 2 Coats of Ace Paint